Kaika V5 real-app alignment pass โ this build is being brought section-by-section into line with the approved review HTML while preserving real operational structure and live data pathways.
Inventory
Confirmed opening stock baseline with thresholds, allocations, and action-triggered inventory workflows.
Thursday, April 23, 2026Fiji Time (GMT+12)
Unknown user
Role not set
Critical items visibleManual checks requiredMonthly stock take verified
Inventory Actions
Choose Add Inventory, Manual Stock Take, or Inventory Action above to open the relevant workflow.
Inventory Baseline
Inventory source
Confirmed stock take โ May 2026 workbook
Baseline effective
May 2026
Baseline loaded
2026-05-27
Mode
Opening baseline until live stock movement tracking takes over
This stock take is now the confirmed opening inventory position. Future purchases, allocations, usage, and recounts should move from this baseline.
Verified Available Now
Working list of currently verified stock that can be allocated across active jobs right now.
Epoxy Resin Part A
AvailableVerified from Rio stock workbook โ 1,750 L on hand
Primary resin stock for current laminating program
Epoxy Resin Part B
AvailableVerified from Rio stock workbook โ 595 L on hand
Paired hardener stock for current resin program
White Spray Gelcoat
AvailableVerified from Rio stock workbook โ 204 L on hand
Spray and finishing workflow across active jobs
WR800 + 450 CSM Fiberglass
AvailableVerified from Rio stock workbook โ 28 rolls on hand
Structural fiberglass layup stock
20mm H80 perforated foam core
AvailableVerified from Rio stock workbook โ 84 sheets on hand
Core structural material for active and future builds
4mm twin core tinned cable wire
AvailableVerified from Rio stock workbook โ 190 meters on hand
Marine electrical routing and fit-out work
Masking tape 25mm
AvailableVerified from Rio stock workbook โ 81 units on hand
Workshop consumable for paint, prep, and finishing
Watch / Low Stock
Validation Item validation-2026-05-13T03:28:29.176Z
WatchValidation inventory action
Mike Tubbs 28 Centre Console
Polyester resin
WatchAllocate by hull schedule and monitor bulk purchasing timing
Guy Shahar 28 Full Cabin
40mm P80 PET foam core
WatchAllocate against structural work and future surf-boat planning
Daniel Gray 29.5 Surf Boat
Blocked / Reorder Immediately
Inventory Control
Main inventory list with current stock state, threshold visibility, latest check confirmation, and immediate action guidance.
| Item | On hand | Threshold | Status | Checked | Allocation note | Action |
|---|---|---|---|---|---|---|
| Validation Item validation-2026-05-13T03:28:29.176Z | Latest stock count to be confirmed | Monitor | Watch | CheckedBaseline loaded 2026-05-27 | Mike Tubbs 28 Centre Console | Validation inventory action |
| White spray gelcoat | Latest stock count to be confirmed | Normal | Available | CheckedBaseline loaded 2026-05-27 | Mike Tubbs 28 Centre Console | Track issue rate against active laminating work |
| Catalyst | Latest stock count to be confirmed | Normal | Available | CheckedBaseline loaded 2026-05-27 | Mike Tubbs 28 Centre Console | Keep reorder timing tied to resin-heavy build stages |
| Polyester resin | Latest stock count to be confirmed | Monitor | Watch | CheckedBaseline loaded 2026-05-27 | Guy Shahar 28 Full Cabin | Allocate by hull schedule and monitor bulk purchasing timing |
| 40mm P80 PET foam core | Latest stock count to be confirmed | Monitor | Watch | CheckedBaseline loaded 2026-05-27 | Daniel Gray 29.5 Surf Boat | Allocate against structural work and future surf-boat planning |
Stock Take Status
Confirmed Opening Baseline
Loaded into inventory section
May 2026 stock take ยท loaded 2026-05-27
Current source of truth
Confirmed stock take โ May 2026 workbook
Opening baseline until live stock movement tracking takes over
Inventory Actions: reorder, allocation, blocker, and stock-action decisions should appear after an item or action is selected.